Trailer based copper reclaim unit. Platforms, hoppers and chutes removed ready for transport.
Skid mounted oxidiser unit.  Initial test runs to calibrate nitrogen and air mixture to control burn rates.
Trailer based concrete batch plant.  Guarding system around conveyor.
Ammonium Nitrate dispatch and storage units.  A few late additions to the design.
Mining project.  Conveyor system nearing completion, almost ready for commissioning.
Skid mounted oxidiser unit.  Initial test runs to calibrate nitrogen and air mixture to control burn rates.
Mining project.  Assembling excavator on site.
Trailer based copper reclaim unit. Side view of 15m stainless bowl.
Trailer based concrete batch plant.  Ready for delivery overseas.
Trailer based copper reclaim unit. Initial model finished ready for customer.
Mining project.  400t crane repair job on one of the booms load cell circuits.
Skid mounted oxidiser unit.  Final modelling finished, ready for presentation to the powers above.
Mining project.  Conveyor system nearing completion, almost ready for commissioning.
Transport designs.  Rear mounted forklift on nice new flat bed.
9 metre mixer model.
Mixer mounted on an underground chassis.
AN bomb truck needs a redesign, cracking rails due to incorrectly positioned bowl on the chassis.
Ammonium Nitrate dispatch and storage units.  Testing placement on load cell bases of the two 30 metre bowl structures.
Trailer based concrete batch plant.  Two units set up for a project in one of the wettest places on the planet.
New over centre locking tail gate design, improving on the unreliable brake booster design.
Trailer based copper reclaim unit. Waiting for delivery to site, then straight into 14 months of service.
Horizontal mobile silo design.